WET BASEMENTS INTERIOR

Membrane is installed up the wall and over tiles and anchored in place. This directs the water from the newly drilled out holes to make its way to the inside tile system. Trench is cemented level with floor. 
 

Repairing a wet basement from the inside involves removing a portion of the concrete floor next to the block foudation so we can expose the footings and weeping tile systems. All debree and old weeping tiles are removed and system is checked to make sure its still functional.


We then proceed to drill out the block foundation both to relieve hydrostatic pressure and to drain all blocks to the inside tile system. New Big O tile is installed and Trench is then backfilled with clean crushed stone to maximise drainage.


Membrane is installed up the wall and over tiles and anchored in place. This directs the water from the newly drilled out holes to make its way to the inside tile system. Trench is cemented level with floor.

Panneled walls before interior basement repair. All items are moved and work area is cleared.

 

Pannelling is carefully taken out and put aside. Studs are cut out and thrown away if rotted, moldy or deteriorated.
 

New Big-O tile is installed and a proper stone bed is layed to ensure maximum drainage
 

Trench is cemented level with floor.
 

 After stone bed is layed, membrane is installed up wall and over trench. This directs all drainage holes that were drilled directly into tile system.
 

Customers have questions, you have answers. Display the most frequently asked questions, so everybody benefits.

 

Our carpenters replace or put back all studs, panneling, electrical and baseboards. The end result is a dry living area backed by our 10 year transferable warrenty.